To use parametric estimating, first divide a project into units of work. Then, you must determine the cost per unit, and then multiply the number of units by the costper unit to estimate the total cost.
(i) Dry material for 100 cft of cement concrete
(ii) Bitumen for 100 sft of DPC (first coat)
(iii) Bitumen for 100 sft of DPC (second coat) Material 154x1x6.93/(100x7) Cement= 154x2x6.93/(100x7) Sand= /(100x7)
(iii) Coarse aggregate=154x4x6.93 Bitumen = Polythene Sheet (2 x 55.5) 6.93 cft 154 cft 15 Kg 10 Kg 1.52 cft 3.04 cft 6.09 cft 13.87 Kg 111.0sft 5
No comments:
Post a Comment
Thanks for Comments